An overview
A standard slide speed is 2.5-3.5 metres per day, depending on the complexity of the construction. For simpler constructions, the speed can reach as much as 7-8 metres per day. Naturally, this saves a lot of time. Sliding formwork is normally performed in round-the-clock shifts, but if necessary or desirable, night shifts can be dropped. The short construction time will result in reduced costs for crane hire, labour, mixing stations, etc. At the same time, the subsequent work can be started earlier.

Examples:
Lift shaft/stairwell with openings
Height: 40 metres
Wall length: 60 metres
Total area: 4800 m2
Round-the-clock operation

A normal timeframe for sliding casting – installation, operation, dismantling – will be around 30 days. Completing the same construction with climbing casting would take around 70 days.








16.08.2014
News stories and events presented here.
Les mer

16.08.2014
News stories here.
Les mer