Lyse gass
Kunde: Kruse Smith
Byggeår: 2008
Sted: Stavanger, Norway
Konstruksjonstype: Tank
Omfang: 6,300 m2 – Height: 20 metres

Beskrivelse:
Interform performed the sliding casting of the LNG tank in January/February 2008. The tank diameter was 49 metres and the slide was in continuous operation for seven days. The project involved the use of a concrete pumping system similar to the one used on the Snøhvit and Isle of Grain projects.