New Opera House, Oslo | ||||
Kunde: | Veidekke | |||
Byggeår: | 2005 | |||
Sted: | Oslo, Norway | |||
Konstruksjonstype: | Stage tower | |||
Omfang: | 7,700 m2 – Height: 50 metres | |||
Beskrivelse:
The sliding casting process on the stage tower for the new Opera House was carried out in spring 2005. It was a challenging project, as it involved large openings (20 x 20 metres) and changes in the cross-sections of both walls and shafts. From the start of the slide until the casting was finished took 23 days’ continuous operation.
Flere bilder:
View the embedded image gallery online at:
http://interform.as/index.php?option=com_content&view=article&id=93:new-opera-house-oslo&catid=19:projects-en&Itemid=155#sigFreeIde1ea3a3ff8
http://interform.as/index.php?option=com_content&view=article&id=93:new-opera-house-oslo&catid=19:projects-en&Itemid=155#sigFreeIde1ea3a3ff8