Lyse gass | ||||
Kunde: | Kruse Smith | |||
Byggeår: | 2008 | |||
Sted: | Stavanger, Norway | |||
Konstruksjonstype: | Tank | |||
Omfang: | 6,300 m2 – Height: 20 metres | |||
Beskrivelse:
Interform performed the sliding casting of the LNG tank in January/February 2008. The tank diameter was 49 metres and the slide was in continuous operation for seven days. The project involved the use of a concrete pumping system similar to the one used on the Snøhvit and Isle of Grain projects.
Flere bilder:
View the embedded image gallery online at:
http://interform.as/index.php?option=com_content&view=article&id=99&catid=19&Itemid=155&vsig1_0=-1&vsig1_0=0#sigFreeId4d30064b58
http://interform.as/index.php?option=com_content&view=article&id=99&catid=19&Itemid=155&vsig1_0=-1&vsig1_0=0#sigFreeId4d30064b58